Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/3728
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBabu, N. V. Phanendra-
dc.contributor.authorBabu, P. Suresh-
dc.contributor.authorSarma, D. V. S. S. Siva-
dc.date.accessioned2025-12-26T06:17:20Z-
dc.date.available2025-12-26T06:17:20Z-
dc.date.issued2020-
dc.identifier.citation10.15676/ijeei.2020.12.3.2en_US
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/3728-
dc.descriptionNITWen_US
dc.description.abstractThe Phasor Measurement Unit (PMU) is becoming the most prominent tool for power system applications like power system operation, control, and protection. In a robust and accurate wide-area measuring system, the PMU should observe not only the elements in its substation but also the critical elements and its incident busses. As the PMU cost limits their deployment, they must be installed optimally considering the substation installation and the critical lines in the power system. This paper introduces a new Optimal PMU Placement algorithm considering the optimal substations and the critical elements. This has been done based on the assumption that there must be a PMU in each constructed substation (optimal substation). This will assure the observability of all the elements in the substation. The proposed method has been tested on some standard test systems and then applied to a practical regional Indian grid.en_US
dc.language.isoenen_US
dc.publisherInternational Journal on Electrical Engineering and Informaticsen_US
dc.subjectBinary Cuckoo Search (BCS)en_US
dc.subjectCritical busen_US
dc.titleCritical elements based optimal pmu placement considering substation coverageen_US
dc.typeArticleen_US
Appears in Collections:Electrical Engineering

Files in This Item:
File Description SizeFormat 
400.pdf1.2 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.