Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/3163
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChandram, K.-
dc.contributor.authorSubrahmanyam, N.-
dc.contributor.authorSydulu, M.-
dc.date.accessioned2025-02-06T06:37:32Z-
dc.date.available2025-02-06T06:37:32Z-
dc.date.issued2011-01-
dc.identifier.citation10.1016/j.ijepes.2010.06.022en_US
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/3163-
dc.descriptionNITWen_US
dc.description.abstractThis paper proposes a new methodology for solving Unit Commitment (UC) problem. In the proposed approach, Improved Pre-prepared Power Demand (IPPD) table solves the UC problem and then the Muller method solves the Economic Dispatch (ED) sub-problem. The proposed method has been tested on 3–, 10–, 38– and 40–100 units. Comparison of the simulation results of the proposed method with the results of previous published methods shows that the proposed method provides better solution with less computational time.en_US
dc.language.isoenen_US
dc.publisherInternational Journal of Electrical Power & Energy Systemsen_US
dc.subjectUnit Commitmenten_US
dc.subjectEconomic Dispatchen_US
dc.titleUnit Commitment by improved pre-prepared power demand table and Muller methoden_US
dc.typeArticleen_US
Appears in Collections:Electrical Engineering

Files in This Item:
File Description SizeFormat 
1-s2.0-S0142061510001262-main.pdf437.2 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.