Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/3137
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSelvaraj, N.-
dc.date.accessioned2025-02-05T11:13:17Z-
dc.date.available2025-02-05T11:13:17Z-
dc.date.issued2011-07-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/3137-
dc.descriptionNITWen_US
dc.description.abstractThe main objective of this paper is to study the Distributed Scheduling (DS) problems in Flexible Manufacturing System (FMS) environment using simulation model. This FMS is assumed to be single factory and multi factory which are analyzed by production capacity, throughput, utilization and work-in-process (WIP) by considering scheduling rules. The rules which are includes Largest processing time (LPT), shortest processing time (SPT), first come first serve (FCFS) and last come first serve (LCFS). Finally these rules are compared with each other and concluded that which rule is better than others with respect to performances in the view of single factory and multi factory. Further the author has suggested future research works tooen_US
dc.language.isoenen_US
dc.publisherProceedings of the World Congress on Engineeringen_US
dc.subjectDistributed Schedulingen_US
dc.subjectFMSen_US
dc.titleApplication of Simulation Model for Distributed Scheduling Problems in FMSen_US
dc.typeOtheren_US
Appears in Collections:Mechanical Engineering

Files in This Item:
File Description SizeFormat 
WCE2011_pp885-889.pdf695.11 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.