Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1775
Full metadata record
DC FieldValueLanguage
dc.contributor.authorReddy, B.S.P-
dc.contributor.authorRao, C.S.P.-
dc.date.accessioned2024-11-26T05:47:45Z-
dc.date.available2024-11-26T05:47:45Z-
dc.date.issued2006-
dc.identifier.citation10.1007/s00170-005-0223-6en_US
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/1775-
dc.descriptionNITWen_US
dc.description.abstractA carefully designed and efficiently managed material handling system plays an important role in planning and operation of a flexible manufacturing system. Most of the researchers have addressed machine and vehicle scheduling as two independent problems and most of the research has been emphasized only on single objective optimization. Multiobjective problems in scheduling with conflicting objectives are more complex and combinatorial in nature and hardly have a unique solution. This paper addresses multiobjective scheduling problems in a flexible manufacturing environment using evolutionary algorithms. In this paper the authors made an attempt to consider simultaneously the machine and vehicle scheduling aspects in an FMS and addressed the combined problem for the minimization of makespan, mean flow time and mean tardiness objectives.en_US
dc.language.isoenen_US
dc.publisherInternational Journal of Advanced Manufacturing Technologyen_US
dc.subjectAutomated guided vehicleen_US
dc.subjectEvolutionary algorithmsen_US
dc.subjectMultiobjectiveen_US
dc.subjectNon-dominated solutionsen_US
dc.subjectSchedulingen_US
dc.titleA hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMSen_US
dc.typeArticleen_US
Appears in Collections:Mechanical Engineering

Files in This Item:
File Description SizeFormat 
s00170-005-0223-6.pdf206.46 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.