Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1518
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChandram, K-
dc.contributor.authorSubrahmanyam, N-
dc.contributor.authorSydulu, M-
dc.date.accessioned2024-11-19T04:52:50Z-
dc.date.available2024-11-19T04:52:50Z-
dc.date.issued2008-
dc.identifier.citation10.1109/TENCON.2008.4766599en_US
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/1518-
dc.descriptionNITWen_US
dc.description.abstractTThis paper presents a new approach with muller method for solving profit based unit commitment (PBUC). In Deregulated environment, the generation companies (GENCOs) schedule their generators to maximize their profit rather than satisfying the power demand. The PBUC problem is solved by the proposed approach in two stages. Initially, the information of committed units is obtained by a simple approach and finally non linear programming sub problem of economic dispatch is solved by Muller method. The proposed approach has been tested on a power system with 3 and 10 generating units. Simulation results of the proposed approach have been compared with existing methods and also with traditional unit commitment. It is observed from the simulation results that the proposed algorithm provides maximum profit with less computational time compared to existing methods.en_US
dc.language.isoenen_US
dc.publisherIEEE Region 10 Annual International Conference, Proceedings/TENCONen_US
dc.subjectProfit based unit commitmenten_US
dc.subjectMuller method and Deregulationen_US
dc.titleImproved pre-prepared power demand table with Muller method for solving Profit Based Unit Commitmenten_US
dc.typeOtheren_US
Appears in Collections:Electrical Engineering

Files in This Item:
File Description SizeFormat 
chandram20082.pdf285.8 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.