Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1518
Title: Improved pre-prepared power demand table with Muller method for solving Profit Based Unit Commitment
Authors: Chandram, K
Subrahmanyam, N
Sydulu, M
Keywords: Profit based unit commitment
Muller method and Deregulation
Issue Date: 2008
Publisher: IEEE Region 10 Annual International Conference, Proceedings/TENCON
Citation: 10.1109/TENCON.2008.4766599
Abstract: TThis paper presents a new approach with muller method for solving profit based unit commitment (PBUC). In Deregulated environment, the generation companies (GENCOs) schedule their generators to maximize their profit rather than satisfying the power demand. The PBUC problem is solved by the proposed approach in two stages. Initially, the information of committed units is obtained by a simple approach and finally non linear programming sub problem of economic dispatch is solved by Muller method. The proposed approach has been tested on a power system with 3 and 10 generating units. Simulation results of the proposed approach have been compared with existing methods and also with traditional unit commitment. It is observed from the simulation results that the proposed algorithm provides maximum profit with less computational time compared to existing methods.
Description: NITW
URI: http://localhost:8080/xmlui/handle/123456789/1518
Appears in Collections:Electrical Engineering

Files in This Item:
File Description SizeFormat 
chandram20082.pdf285.8 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.